The project of the extension project of Xiantou Shatou Upper Cross Guangzhou-Shenzhen Railway Bridge Extension Line has been approved by the Zengcheng District Development and Reform Bureau of Finance and Work Bureau of Guangzhou City. The project owner approved the construction of Guangzhou Zengcheng District. In the local highway management station, the construction fund is provided by the overall financial arrangement of Zengcheng District. The proportion of the project's capital contribution is 100%, and the bidder is the local highway management station in Zengcheng District of Guangzhou City. The project has already met the conditions for bidding. The project is now undergoing open bidding.
2. Project overview and scope of tender
2.1 Project Overview and Bidding Scope
2.1.1 Project Overview
The outline of the tendering project: The project is constructed according to the standard of the first-class highway combined with the main roads of the city. The total length of the road is 1751m, divided into K0+000~K0+668.541 and K1+038.621~K2+120.848. The roadbed is 40 meters wide. 6 lanes, design speed 60km/h, asphalt pavement for all roads, supporting water supply, drainage, transportation and ancillary facilities along the line.
2.1.2 Bidding scope
The scope of this tender project: general contracting for road engineering, traffic engineering and ancillary facilities along the line.
2.1.3 estimated contract price: about 90.58 million yuan.
2.1.4 Plan Duration
Planned Duration: Planned Commencement Date December 2016, Planned Completion Date December 2017, Total 12 months.
2.2 Division of tender sections: There are a total of 1 contract section for this project. The details are as follows:
Bid Length (km) Station Range Main Projects Performance Requirements for Bidders Qualification Requirements for Bidders
1.751 K0+000~K0+668.541ã€K1+038.621~K2+120.848 Road engineering, traffic engineering and ancillary facilities along the line. The specific quantity of the project is based on the design documents and quantity list of this project. In the past five years, it must be successfully completed independently: the construction of new or reconstructed grade 1 (or above) roads (including roadbeds and asphalt pavements) shall be carried out with at least 3 contractual sections (including 3), and a total of more than 20km (including 20km) ). It must have the qualification of first class or above for general contracting of highway construction issued by the Ministry of Housing and Urban-Rural Development of the People's Republic of China.
3. Bidder qualification requirements
3.1 The tender requires bidders to have the corresponding qualifications listed in the above paragraph 2.2; have the performance listed in the above paragraph 2.2, and have the corresponding construction capabilities in terms of personnel, equipment, funds and other aspects.
3.2 The Commonwealth does not accept bids from the Consortium.
5.1 Any interested bidder is requested from November 14, 2016 to November 18, 2016 (excluding legal holidays, statutory holidays, etc.)
Fish Tank
Jinhu Weibao Trading Co., Ltd , https://www.weibaoxd.com